Refugee camp in Ireland

Refugee camp wastewater treatment with wastewater construct

ClearFox® wastewater treatment for a refugee camp

Project

Data

2018

Location

Ireland

SITUATION

A change of use in the building to house refugees required a new wastewater treatment plant to be installed. Extremely low discharge standards needed to be achieved as treated wastewater is discharged into a a very sensitive river.

SOLUTION

Multi-stage SBR biological treatment, sludge stabilisation, subsequent precipitation with final flocculation filtration.

PROCESS FLOW

Prechamber with denitrification and anoxic zone, mixing device, SBR biology with multiple, hydraulically dependent filling, feed reservoir with high-pressure pumps for filling the multi-stage filters, blending sections for previous precipitation and pre-flocculation inline. Flocculation and filtration in filter modules. Backflushing via back-flow water, fully automated operation.

Blick-in-Reaktor
Aeration membranes
Dosing device
Dosing device

ADWANTAGES

  • Meeting all customer requirements
  • quick construction
  • economic technology
  • highest outlet requirements
  • compliance with discharge standards

SERVICE

We were able to show that Clearfox SBR plants meet even the highest discharge requirements. Layout, preliminary planning, construction and project planning, delivery, assembly management

Read More About ClearFox® Mobile Projects

Read More About ClearFox® Projects With SBR Technology

Speak to one of our team today!