We could offer out of one hand our standard ClearFox containerized treatment modules by looking back on more than 25 years experience of industrial wastewater.
The process technology suggested from PPU was validated by external consulting offices. All modules have been before approved externally, the precasted modules had finally the best price/quality relation in comparison to our competitors all over Europe.
The wastewater can be led through several process steps. The process is fully automatic and the daily flowrate, which is depending on the rainfall can be adjusted manually. All steps can be bypassed, and the flow can be reversed by manually switching valves (i.e. if more nitrate in raw water, then first denitrification, then nitrification)
The following effluents between the treatment steps are achieve
The wastewater treatment system was brought into operation in November 2018. The final acceptance procedure was the end of March 2019. Manufacturing time was 12 weeks.
Technical Data
- Dissolved Air Flotation
- Ozone treatment
- Fixed-bed biological reactor FBR (nitrification- denitrifcation)
- Final clarifier as lamella separator
Capacity: 600 m³/d, max. 25 m³/h
Input: Landfill waste water
Output: German, European and International standards