The existing industrial wastewater cleaning plant was installed with the activated sludge procedure (aeration tank) with secondary sedimentation chamber. The biology is assisted by adding substantial volumes of external carbon sources as substrate substitute. The large dimension reactor volume (approx. 600 m³) causes significant operational costs and problems during winter operation due to temperature. The existing aeration tank is an enamel steel tank positioned above ground. The tank is corroding and no longer fit for purpose.