Upgrading of a municipal wastewater treatment plant

ClearFox® leasing wastewater treatment plant for upgrading a municipal wastewater treatment plant

Municipal wastewater treatment

Upgrading of a municipal wastewater treatment plant

ClearFox® leasing wastewater treatment plant for upgrading a municipal wastewater treatment plant

Municipal wastewater treatment

Project Details


Size 10 m³/hr dry weather inflow
Location Germany
Completed 2022

Project Delivery


Features Additional cleaning performance to the existing disc immersion tank
Preparation for direct discharge
Lease-to-buy
Treatment Modules ClearFox® FBBR
ClearFox® Clarifier

Project Results


Before After
COD 420 mg/l 90 mg/l
BOD 210 mg/l 20 mg/l
Ptot 48 mg/l 12 mg/l

Discussion


Situation

In a municipality in southern Germany, the existing wastewater treatment plant with a disc submerged basin could no longer meet the limits for direct discharge. It was therefore decided to renovate the plant. To ensure wastewater treatment during the renovation, the municipality looked for an interim solution. To this end, it commissioned an engineering firm, which contacted PPU Umwelttechnik GmbH.

Problem

The municipality’s challenge was to find a temporary solution to bridge the construction phase of the actual wastewater treatment plant. On the one hand, the construction time and costs of the interim sewage treatment plant had to be kept within limits, and on the other hand, it had to be able to comply with the required discharge values. These require a COD of 90 mg/l and a BOD5 of 20 mg/l. The construction of new wastewater treatment plants or temporary discharges to nearby plants are both time-consuming and cost-intensive.

Solution

Containerised wastewater treatment plants are an ideal solution. These are suitable both as a strengthening upgrade and as a complete replacement for existing wastewater treatment plants.

PPU Umwelttechnik GmbH specialises in containerised wastewater treatment plants. It has already equipped numerous municipalities with customised wastewater treatment solutions. For this project, PPU offered two containers with a submerged fixed bed. The process is known for its high purification performance, which remains stable even when overloaded or underloaded. This is a decisive advantage, especially during periods of rain or drought.

PPU supplied two containers for a period of 6 months. These included the ClearFox® FBR process for biological treatment and the ClearFox® lamella clarifier for sludge treatment.

The leasing offer also included a purchase option after six months. As the municipality was very satisfied with the cleaning performance of the containerised wastewater treatment plant, it took over the plant completely and replaced the rotating immersion tank.

Have a question about your own project?

Fill out this field
Please enter a valid email address.
Fill out this field
You need to agree with the terms to proceed

Featured Modules

Preperation of a containerized wastewater treatment plant
ClearFox containerized municipal wastewater treatment plant

Explore our ClearFox® success stories